Find the Delivery Floor Hidden in a Project’s Dependencies
A list of task lengths hides the work that must wait for other work. Enter durations and predecessor names to expose earliest starts, earliest finishes and the longest dependency chain before promising a delivery day.
1 · task | duration workdays | predecessor labels, or -
FIRST-LOAD
HYPOTHESIS / PROTOTYPE — checkout unavailable. Calculation is local. A draft is saved automatically in this browser profile when storage is available; Reset to sample clears it. Optional Pro history stores only five summaries and has its own deletion control. State links encode your inputs and can remain in browser history, clipboard or recipients’ records; share only non-sensitive rows. Optional external AI formatting leaves this device. The required site analytics beacon reports page activity; shared URLs contain encoded inputs. Do not treat an encoded URL as private. The calculator has no input-collection endpoint.
Data note: The dependency-rung route processes task | duration workdays | predecessor labels, or - locally. Starter/sample selection and Run compute in this tab; no input is sent by the calculator. A local draft may be saved; explicit state-link sharing or optional external AI formatting can disclose inputs. Use non-sensitive labels.
Perspective: Before: task lengths hid which handoff controlled the finish. After: the longest dependent route and each task’s float are visible, while resource constraints remain a separate question.
2 · Read the dependency-rung route
Dependency arithmetic only, not a delivery guarantee, staffing recommendation or employment assessment. It assumes unlimited parallel resources and omits calendars, uncertainty and fixed constraints. Confirm the route and available people with the project owner before making a commitment; do not use it to judge workers.
Paid layer: dependency-rung route filing layer
one-time step · the free reading above stays complete
Free tier
- one complete unwatermarked dependency-rung route run in the app
- three labeled samples and unlimited article-demo calculations
- complete result text and a user-triggered input-state link
What $4 one-time adds
- unlimited subsequent dependency-rung route app calculations after a local convenience signal
- print the dependency-rung route with visible assumptions and its safety boundary
- CSV of the displayed workdays and row workings; conditional estimate uses your manual-retyping minutes
- five local reading summaries (headline/count/time), not saved full inputs or cross-device backups
HYPOTHESIS / PROTOTYPE: $4 is a proposed one-time price for filing the dependency-rung route, not a current sales offer. No measured time saving or buyer demand is claimed. The optional manual-retyping baseline above estimates one export’s retyping budget only; it does not change the calculation or guarantee savings.
Local history (this device)
- No saved runs yet — your first run files here.
Checkout is unavailable. Browser-local, profile-scoped convenience gating is best-effort, not server-verified access. A URL or browser flag is not proof of payment. Clearing browser data removes local state; no account or cross-device recovery is provided.
Boundary and sources
Dependency arithmetic only, not a delivery guarantee, staffing recommendation or employment assessment. It assumes unlimited parallel resources and omits calendars, uncertainty and fixed constraints. Confirm the route and available people with the project owner before making a commitment; do not use it to judge workers.
- Method: Earliest start is the maximum predecessor finish, or zero for a starting task. Finish equals start plus duration. The delivery floor is the maximum finish across tasks. A backward pass from that floor identifies zero-float tasks; their row notes show why shortening another branch may not help.
- All sample records, dates, quantities and labels are invented. No outside policy, contract, rate, clock offset, measurement or accessibility standard is represented as verified.
- Google’s official pricing documentation, fetched 2026-09-30, says AI Studio is free in available regions. Optional formatting may require a Google account; manual local entry requires none. Limits can change and free-tier content may be used to improve products. Do not send private records.
Mechanism: competence-autonomy-loop
Optional AI formatting, never the calculation
Manual entry completes this dependency-rung route for free without signup. If available to you, the free AI Studio interface linked in the sources may format fictional or non-sensitive notes; external access may require an account. No API key or AI call is built into this tool. Free-tier content may be used to improve products. Review each cell and transcribe it to the labeled row schema; do not paste the JSON object into the row box.
Format only these fictional or non-sensitive notes for a dependency-rung route. Return strict JSON shaped as {"rows": [{"label": "string", "cells": ["string", "string"]}], "setting": "string"}. The columns are task | duration workdays | predecessor labels, or -; the setting is Planned delivery window in workdays from day zero. Keep all supplied strings and quantities exactly; do not calculate, infer missing entries, invent dates or add advice. If any required value is missing, return an empty rows array and ask me for it separately. I will verify every cell against my source and manually transcribe rows using vertical bars before running the local calculator.An AI response is not executed, fetched or trusted as a result. Missing values remain questions; the strict local parser checks the rows you actually enter.