claim card / flight 2 · free workflow
Assemble a Delay Claim Packet Before You File — Free
Paste your notes and the packet checks the five slots an airline asks about, so the missing piece is found while you still have the boarding pass in a drawer.
What this replaces
Delay claims get rejected on a missing booking reference or an unrecorded reason. This checks the five slots before you file, so the gap is closed while the receipts are still in a bag somewhere.
Tool note. This runs entirely in your browser — no account, no upload, no paid API key. Google NotebookLM is named as the free source-grounded reading path for the material you paste; its published free-tier terms were checked on 2026-09-13 and can change.
The four passes
Collect the smallest useful input
Paste your notes: flight, delay length, the stated reason, the booking reference, expenses.
Let the packet check the slots
Filled slots are counted; empty ones rank highest.
Get the reason in writing
The reason decides whether the claim is payable at all.
Keep every receipt
Expenses without receipts are expenses you will not recover.
Try it on the claim card / flight 2
The board below runs in your browser. It opens with a worked sample so the result is visible before you paste anything; switch scenarios, edit the text, or reset to the sample.
running the sample…
first-load · sample values are illustrative, not verified facts
Everything you paste stays in this browser tab. Nothing is uploaded, there is no account, and no request leaves the page to generate the result; clearing site data removes anything saved locally.
What breaks, and what to do
Delay length estimated
Check the arrival time against the scheduled time.
Reason given verbally at the gate
Ask for it in writing; the packet only records what you have.
Claims already filed
The packet cannot check what you sent; use it before filing.
Go deeper — Claim Card
The free board above is the whole loop. The paid tier keeps the arranged output so you do not rebuild it.
- Printable packet in the order an airline's claim form asks for — estimate: 21 minutes saved per claim, basis: 5 slots re-ordered at ~4.2 minutes each
- Saved local history across flights — estimate: 14 minutes saved per claim, basis: re-assembling 5 items at ~2.8 minutes each
$5 one-time