When this tool earns a place on your screen

People who need to organize Compare agreed and revised line-item amounts, preserve the reason and approver label, and show which changes remain unconfirmed; it does not select a contractor or interpret a contract. This is a small, specific coordination job: Compare agreed and revised line-item amounts, preserve the reason and approver label, and show which changes remain unconfirmed; it does not select a contractor or interpret a contract. The app is useful when the details already exist in a bill, note, schedule, official letter, or conversation and you want to put them into a form you can inspect.

It is not a universal answer engine. It does not find the source material, contact another person, send a request, validate a provider's rules, or decide which option is best. It makes the information you choose to enter easier to compare or revisit.

Build gate: what must be true before it is useful?

Pain

After the original estimate, each requested change needs its own description, price impact, date, and approval status.

Who benefits

People who need to organize Compare agreed and revised line-item amounts, preserve the reason and approver label, and show which changes remain unconfirmed; it does not select a contractor or interpret a contract.

Output

A personalized variance-marked folio with editable rows, a computed summary, and an optional CSV you choose to download.

Ten-second proof

The fictional sample is visible immediately. Change one cell and run the tool to see the summary and the entry-level working update.

Price logic

The tool and its complete result cost $0. No paid tier, checkout, or buyer demand claim is configured for this cohort. We do not claim a dollar value for time saved or a paid alternative without evidence.

Personalization

the original scope, revised amount, requested-by label, and approval date you record Use the original units and short, non-sensitive labels.

What the research does—and does not—say

Federal Trade Commission published How To Avoid a Home Improvement Scam. Its relevant finding is:

“The FTC says a written home-improvement estimate should spell out the work, materials, completion date, and price; the contract should capture promises about scope and cost.”

This source fact is deliberately narrower than the product pitch. It describes the source's stated population or guidance; it does not demonstrate consumer demand, prove that this tool helps everyone, or show that a particular user will get a specific result.

Source limitation: Contract requirements and consumer rights vary by state and circumstance. This tool records user-entered change details; it is not a contract, legal review, contractor check, or approval record signed by another party.

Research date: 2026-10-03. This was desk research using an official source. It was not a survey, interview study, usability study, or validation of willingness to pay. The tool idea remains a hypothesis until people with this exact task try it and report where it helps or fails.

The real question is not hidden in the arithmetic

Should work continue on a small change while the revised scope is still awaiting approval?

The tool does not resolve that trade-off. It lets you make the inputs visible, inspect the result, and keep the decision with the person who understands the situation. If the choice depends on a rule, policy, medical fact, legal obligation, or other information not in the rows, stop and check that source instead of treating the number as a verdict.

  • Which row or date is still unconfirmed?
  • Does the result change when you use a different, documented assumption?
  • What does the official source or responsible person still need to confirm?

How the variance-marked folio works

For each line, subtract the entered planned amount from the entered actual amount. The summary adds the plan and actual columns separately, then reports their difference. It does not label a charge valid or decide whether a change was authorized.

  1. Bring the source, not a guess. Use the bill, document, calendar, quote, or instruction that belongs to your situation. Enter short labels and the units shown by that source.
  2. Keep unlike facts in separate fields. A date, status, amount, and owner answer different questions. Avoid packing a private account number or health detail into a free-text note.
  3. Run the local calculation. It operates on the values in this browser tab. Rows are editable, the headline is recomputed, and the method remains visible beside the result.
  4. Verify the next step. Use the original source, agency, provider, employer, or agreed contact to confirm anything consequential. Export only if you choose; review the file before sharing.

Three fictional walkthroughs

All labels, dates, measurements, amounts, and outcomes below are invented. They demonstrate a calculation path, not a real household, person, transaction, plan, or official determination.

A · Start with the supplied sample

Line or itemPlanned amountActual amountNote (optional)
Kitchen tap repair120112baseline entered by user
Hallway paint180205revised amount entered by user
Window seal9090no change in this invented example

Visible result: Recorded total: 407. Compared with the entered plan, the recorded total is 17 higher. Amount units are user-defined; nothing is converted.

  • Planned total: 390
  • Recorded total: 407
  • Difference: +17

This is a deliberately invented starting point. It proves only that the arithmetic and visible rows respond to structured inputs; it is not a market observation or a promise about your case.

B · Change one assumption

Line or itemPlanned amountActual amountNote (optional)
Kitchen tap repair120160baseline entered by user
Hallway paint180205revised amount entered by user
Window seal9090no change in this invented example

Visible result: Recorded total: 455. Compared with the entered plan, the recorded total is 65 higher. Amount units are user-defined; nothing is converted.

  • Planned total: 390
  • Recorded total: 455
  • Difference: +65

This second set changes a small part of the example so you can inspect whether the headline follows the input you changed. If a different source value is more reliable, use that value instead of trying to preserve the sample result.

C · Keep the edge case explicit

Line or itemPlanned amountActual amountNote (optional)
Kitchen tap repair00zero is explicit, not missing

Visible result: Recorded total: 0. Compared with the entered plan, the recorded total is unchanged. Amount units are user-defined; nothing is converted.

  • Planned total: 0
  • Recorded total: 0
  • Difference: 0

A small or single-row example shows where the output becomes thin. It does not represent a typical household, case, applicant, or trip; one row can be calculated without being broadly informative.

Three ways a neat result can still be wrong

If the input was transcribed incorrectly

The tool may still return a neat number. Compare every row with the original bill, note, calendar, quote, or official instruction before acting.

If a field means something different in the source

The app does not resolve a provider-specific definition. Keep the source label and unit visible; stop rather than force two unlike items into one comparison.

If the output is treated as a decision

A total, gap, or flagged date is a prompt to verify, not an instruction. Use the official contact, qualified professional, or responsible person named in the boundary.

If a number looks surprising, return to the source and fix the row. Do not change the input until it agrees with an expectation.

Boundaries and privacy

This is transparent arithmetic from user-entered assumptions, not financial, legal, accounting, tax, contract, or purchasing advice. Verify the source documents and decide with the responsible person.

The app does not upload, save, or share entries by default. You may explicitly save a draft in the browser profile; that storage is not encrypted and can be visible to someone with access to the device. Use non-sensitive labels. Copy produces an aggregate summary without row-level values; CSV and print are separate actions you initiate.

The website includes a Cloudflare page-view beacon. The app does not add form values to that request. External source links open official pages when you choose them. No AI, provider integration, or third-party calculation service is built into the app.

A useful ending

Keep the source beside the result. If another person needs to rely on the next step, make the owner and confirmation explicit. Re-run the calculation only when the input changes; a cleaner display is not new evidence.

Full app: no account, no fee, no usage cap, and no checkout. The article and calculator are separate pages; the app remains usable without reading this guide.

Open the complete free tool