Record a Home-Repair Scope Change Before Extra Work Starts
After the original estimate, each requested change needs its own description, price impact, date, and approval status.
Compare agreed and revised line-item amounts, preserve the reason and approver label, and show which changes remain unconfirmed; it does not select a contractor or interpret a contract.
What changes the result: the original scope, revised amount, requested-by label, and approval date you record.
Privacy: Calculations run in this browser tab. This tool has no input-upload, account, or AI endpoint. The site may send a page-view signal to Cloudflare; this tool does not add form entries to that signal. A draft is stored only if you choose “Save draft on this device”; that browser storage is not encrypted. Avoid identifiers or sensitive details, and delete saved drafts when finished.
Your entries
The starting rows below are fictional examples. Edit them, replace them with non-sensitive labels and values, or load the sample again. The result is not advice or a source verification.
Amount fields use the same units you enter; the app does not choose a currency. Dates are the ones you provide. Up to 100 rows per run.
Calculated output
What the calculation does
For each line, subtract the entered planned amount from the entered actual amount. The summary adds the plan and actual columns separately, then reports their difference. It does not label a charge valid or decide whether a change was authorized.
Question to keep open: Should work continue on a small change while the revised scope is still awaiting approval?
Boundary: This is transparent arithmetic from user-entered assumptions, not financial, legal, accounting, tax, contract, or purchasing advice. Verify the source documents and decide with the responsible person.
Copy includes the headline, aggregate metrics, and boundary—not the row-by-row input. The CSV contains entries you choose to download. Review it before sharing.